Commit Graph

11 Commits

Author SHA1 Message Date
Robin. P. Clark
cc1c2d1a95 Strong double prec low pass added 2019-09-11 12:29:36 +01:00
8bd3e66be3
Update two_pole_7_8.c 2019-09-11 09:04:21 +01:00
Robin. P. Clark
c1bded0f5a Filter 15 16 chosen 2019-09-10 11:38:04 +01:00
Robin. P. Clark
7562cf3246 15 16 squared lag filter now ready for 8 bit compiler
maybe BINFRACS is a higher than it needs to be.
2019-09-10 10:53:17 +01:00
Robin. P. Clark
2647f7e4d4 first attempt at zg. Did not make much difference although increased the
gain. Perhaps the zeros needs to be closed in frequency to the dc line
These ones were at 7/8 which is 29 degrees approx.
Probably not enough to make a real difference.
2019-09-10 09:42:57 +01:00
Robin. P. Clark
38d2a276e7 (z+j(z-j)(z+1) experiment 2019-09-10 09:27:29 +01:00
Robin. P. Clark
5d5a2cb72f Zero poles at half nyquist 2019-09-10 09:12:01 +01:00
e82ae9f183 500 noise on 1500 signal 2019-08-26 09:44:24 +01:00
44d99a527f As an experiment fed the 7/8 LAG in twice. It tstill does not perform as
well as the two pole filter
2019-08-26 09:41:24 +01:00
8d26c1ebf4 DC_TERM now a #define 2019-08-26 07:02:34 +01:00
0acf067386
two pole files with int sizes specified 2019-08-26 06:50:52 +01:00