Another automated FMEA paper.
This commit is contained in:
parent
2397f3d09f
commit
d113f6a7bc
11
mybib.bib
11
mybib.bib
@ -270,6 +270,17 @@ keywords={Automotive engineering;Computer industry;Electrical engineering;Engine
|
|||||||
doi={10.1109/STEP.2003.12},
|
doi={10.1109/STEP.2003.12},
|
||||||
ISSN={},}
|
ISSN={},}
|
||||||
|
|
||||||
|
@INPROCEEDINGS{931423,
|
||||||
|
author={Throop, D.R. and Malin, J.T. and Fleming, L.D.},
|
||||||
|
booktitle={Aerospace Conference, 2001, IEEE Proceedings.}, title={Automated incremental design FMEA},
|
||||||
|
year={2001},
|
||||||
|
month={},
|
||||||
|
volume={7},
|
||||||
|
number={},
|
||||||
|
pages={7 -3458 vol.7},
|
||||||
|
keywords={Analytical models;Design automation;Design engineering;Discrete event simulation;Failure analysis;Hybrid power systems;Performance analysis;Production;Propulsion;Steady-state;aerospace computing;aerospace simulation;discrete event simulation;engineering computing;failure analysis;production engineering computing;CONFIG hybrid discrete event simulator;EPOCH Simulation for Failure Analysis software;EPOCH algorithm;automated incremental design FMEA;automatic generation;design models;engineering product/operations cross-cutting hybrid simulation ;failure modes;failure modes/effects analysis;functional labels;propellant production plant;scenario scripts;scenario-based analyses;space systems;timestep modeling;},
|
||||||
|
doi={10.1109/AERO.2001.931423},
|
||||||
|
ISSN={},}
|
||||||
|
|
||||||
@INPROCEEDINGS{5754453,
|
@INPROCEEDINGS{5754453,
|
||||||
author={Snooke, N. and Price, C.},
|
author={Snooke, N. and Price, C.},
|
||||||
|
BIN
related_papers_books/00931423.pdf
Normal file
BIN
related_papers_books/00931423.pdf
Normal file
Binary file not shown.
@ -35,7 +35,7 @@ a brain-storming session
|
|||||||
to formal submission as part of safety critical certification.
|
to formal submission as part of safety critical certification.
|
||||||
When performed as part of a safety critical certification process FMEA
|
When performed as part of a safety critical certification process FMEA
|
||||||
is a time consuming business. To reduce amount of work to perform,
|
is a time consuming business. To reduce amount of work to perform,
|
||||||
software packages and analysis strategies have been developed~\cite{incrementalfmea, automatingFMEA1281774}.
|
software packages~\cite{931423} and analysis strategies have been developed~\cite{incrementalfmea, automatingFMEA1281774}.
|
||||||
%
|
%
|
||||||
FMEA is always performed in context. That is, the equipment is always analysed for a particular purpose
|
FMEA is always performed in context. That is, the equipment is always analysed for a particular purpose
|
||||||
and in a given environment. An `O' ring for instance can fail by leaking
|
and in a given environment. An `O' ring for instance can fail by leaking
|
||||||
|
Loading…
Reference in New Issue
Block a user