fmea more text
This commit is contained in:
parent
1c483a8782
commit
392a7551cb
@ -198,6 +198,7 @@ This is an early static analysis methodology, and concentrates
|
|||||||
on SYSTEM level errors which have been investigated.
|
on SYSTEM level errors which have been investigated.
|
||||||
The investigation will typically point to a particular failure
|
The investigation will typically point to a particular failure
|
||||||
of a component.
|
of a component.
|
||||||
|
|
||||||
The methodology is now applied to find the significance of the failure.
|
The methodology is now applied to find the significance of the failure.
|
||||||
It is based on a simple equation where $S$ ranks the severity (or cost \cite{bfmea}) of the identified SYSTEM failure,
|
It is based on a simple equation where $S$ ranks the severity (or cost \cite{bfmea}) of the identified SYSTEM failure,
|
||||||
$O$ its occurrence\footnote{The occurrence $O$ is the
|
$O$ its occurrence\footnote{The occurrence $O$ is the
|
||||||
@ -211,6 +212,11 @@ This gives in effect
|
|||||||
a prioritised `to~do~list', with higher $RPN$ values being the most urgent.
|
a prioritised `to~do~list', with higher $RPN$ values being the most urgent.
|
||||||
|
|
||||||
\fmeagloss
|
\fmeagloss
|
||||||
|
FMEA can be used as a quality improvement tool for industry. In this role,
|
||||||
|
it is a living document used to log system failures.
|
||||||
|
Management and quality product maintenance
|
||||||
|
can use the $RPN$ value for a new SYSTEM failure to decide on the urgency
|
||||||
|
of corrective action.
|
||||||
|
|
||||||
|
|
||||||
\subsubsection{ FMEA weaknesses }
|
\subsubsection{ FMEA weaknesses }
|
||||||
|
Loading…
Reference in New Issue
Block a user